Green River Dam

The removal of a dam along the Green River in Edmonson County began Tuesday, and will continue over the next few weeks.

Once the dam is removed, the affected part of the Green River will become a recreational area, with parking and access ramps for canoes and kayaks. The U.S. Army Corps of Engineers is funding the project, but will transfer ownership of 18 nearby acres of land to the Kentucky Department of Fish and Wildlife.

Lee Andrews, with The Kentucky Department of Fish and Wildlife, said the Green River contains some of the top biodiversity within the Ohio River system.

 

“So being able to restore this much river in a national park is unique,” Andrews said.  

US Army Corps of Engineers

A bill transferring control of infrastructure on the Barren and Green rivers to local communities has passed the U.S. Senate. Majority Leader Mitch McConnell said in a statement the legislation will give more control to Kentucky communities and help with flood protection in Paducah.

The bill will transfer control of inoperable locks and dams along Barren and Green rivers from the U.S. Army Corps of engineers to state and local entities. That will allow local communities to do necessary repairs and maintenance.

Federal Study Recommends Green River Dam Removal

Mar 9, 2014
WKU Public Radio

The U.S. Army Corps of Engineers has proposed removing a dam on the Green River near Mammoth Cave National Park.

The Daily News reports a study includes the recommendation, saying the action would improve aquatic life and recreational activities. Alternative actions include modifying the lock and not disturbing the dam, installing a barricade and disposing of the property or doing nothing.

The river has been closed to navigational traffic for decades and the study says the dams on the river have continued to deteriorate. In addition to removing Green River Dam No. 6 near Mammoth Cave, the study recommends disposing of three other dams along the river as well as Barren River Lock and Dam No. 1.

The federal agency is accepting comments on the proposal through March 17.